With the introduction of BREEAM Refurbishment and Fit Out V7, there has been renewed interest in what has changed from the familiar RFO 2014 requirements.
One area worth looking at is the Indoor Air Quality Plan (IAQP).
The good news is that the IAQP has not been completely reinvented. The fundamental objective remains the same: to identify and manage sources of indoor air pollution throughout the project.
So, what’s changed?
The current GN06 guidance sets out the expected content and rigour of an IAQP under V7. While many of the underlying principles will be familiar to anyone working with RFO 2014, there are some updates that project teams should be aware of.
1. The IAQP remains an important part of the process
The IAQP continues to provide a framework for managing indoor air quality through the design, construction and pre-occupation stages of a project.
It covers areas such as:
- ventilation;
- potential sources of indoor air pollution;
- construction activities;
- material selection;
- air quality testing; and
- measures to be taken before occupation.
For teams already using an established IAQP template, the transition to V7 is therefore more about reviewing and updating the template against the current guidance than starting again from scratch.
2. The plan should be considered throughout the project
The IAQP isn’t simply a document to complete at the end of the assessment.
It should support the management of indoor air quality through the relevant project stages, from design and specification through to construction, commissioning and occupation.
This is particularly important where changes are made during the project, as these may introduce new considerations for indoor air quality.
3. Testing and remedial measures remain important
The IAQP should also establish what happens if indoor air quality testing identifies an issue.
Where VOC or formaldehyde concentrations exceed the relevant limits, appropriate measures should be identified to reduce concentrations, with further testing where required.
Having this process established within the IAQP helps ensure that testing isn’t simply a final compliance exercise.
RFO 2014 vs V7
| RFO 2014 | V7 | |
| IAQP | Required | Required |
| IAQP guidance | Earlier GN06 guidance | Current GN06 guidance |
| Ventilation and IAQ considerations | Included | Retained |
| Construction considerations | Included | Retained |
| Air quality testing | Included where applicable | Retained |
| Remedial measures | Included | Retained |
| Overall approach | Established IAQ management process | Updated guidance and requirements |
The takeaway
For those already working with BREEAM RFO 2014, V7 doesn’t mean starting again with the IAQP.
The core principles remain familiar. The key step is to review existing templates and processes against the latest V7 requirements and GN06 guidance, ensuring that the information being captured continues to meet the current requirements.
For organisations using a standard IAQP template, this provides a straightforward route to transition existing processes into the V7 framework.